bradleyelectric Senior Member Location forest hill, md May 8, 2007 #3 On the window frame. If there isn't 1, ask the general, if there isn't 1 of them, ask the fire marshall, if there isn't 1 of them, I would need to see it.
On the window frame. If there isn't 1, ask the general, if there isn't 1 of them, ask the fire marshall, if there isn't 1 of them, I would need to see it.
quogueelectric Senior Member Location new york May 14, 2007 #5 it cant be all glass it cant be all glass Fish down the mullion and mount surface mount box at proper height.
it cant be all glass it cant be all glass Fish down the mullion and mount surface mount box at proper height.
peter d Senior Member Location New England May 14, 2007 #6 I would duct tape the MC cable or plenum cable right to the glass, and then I would use some silicone to stick the pull station and horn strobe on.
I would duct tape the MC cable or plenum cable right to the glass, and then I would use some silicone to stick the pull station and horn strobe on.
S satcom Senior Member May 14, 2007 #7 I would ask for a sealed detailed drawing from the architect, then proceed to install as detailed.
L LawnGuyLandSparky Senior Member May 14, 2007 #8 Ceiling mount the strobe, and maybe there's a pull-chain pull-station?