A factory is planning to replace five 480V services with a primary high voltage meter and high voltage feeders.
For the high voltage feeders, a salesman reccomended running each phase in a separate conduit. That way, if one cable develops a fault, it won't damage the other two phases.
I was just wondering what opinions people had on this. Is it better to run all three phases in a single conduit?
Steve
For the high voltage feeders, a salesman reccomended running each phase in a separate conduit. That way, if one cable develops a fault, it won't damage the other two phases.
I was just wondering what opinions people had on this. Is it better to run all three phases in a single conduit?