Matt Mckenzie
Member
- Location
- United States
Are we required by code to install an equipment ground to HVAC equipment or does the emt conduit being bonded to both sides exempt us from the requirement? Can someone please help. For example a 92 amp 3 phase 208 HVAC installing 3 #2 conductors in a 1" conduit meets maximum conduit fill or do I have to go to 1-1/4" conduit and install my #8 grounding conductor also?