My question has to do with a service that has 6 meters and disconnects and a house meter and disconect. There is a 800 amp main for the 6 tenant services. I have to comply with 250.64 , does that mean I have to run the GEC thru all the 6 disconects and the size? Size according to the main disco or the indiv 6 ?