Hi. I'm electrical design engineer.
I'm working on a project commercial project which has existing 200A 120/240 v 3-phase delta.
customer change the scope of work and they added some equipment.
Could you please check my work to see my load calculation is correct?
I don't know how to attach files. I don't have the option