I referenced NEC 300.3(A)

Status
Not open for further replies.

Cjmccarthy

Member
Location
Florida
Occupation
Project Coordinator FDOT
I was doing an inspection of a project that is in the final stages and was asked to give the contractor a "Punch List", my question is, I know the picture is against code, but did I reference the correct NEC code violation?
 

Attachments

  • Blue Heron_Wires not jacketed _06162022.jpg
    Blue Heron_Wires not jacketed _06162022.jpg
    466.4 KB · Views: 21

retirede

Senior Member
Location
Illinois
300.3A would be correct if that’s premises wiring. That fact that it’s plugged in indicates that it may not be.
I’d also bet that the plug shown is not listed for use with individual conductors.
 