laketime
Senior Member
I am sizing the feeders for a 200amp residential load center off a meter. I am figuring 2/0 for the feeders (Table 310.15(B)(6)) and a #4 for the ground (Table 250.66). Is that correct? Also what section do I use for the grounding conductor from the panel to the ground rod? We are using the 2008 code. I know the NEC does not require a ground from the meter to the load center, but I have been told that the local inspectors don't see it that way and just pull the ground and drive another rod by the load center location. Comments and questions welcomed.