service change at a stripmall, new 800A main
1. if contractor drives a new ground rod, does existing (present)ground rod need to be bonded? (rod is approx 1' outside new switchgear.
2. if existing ground rod is "not present" (cut off @ grade?) is there a requirement to bond?
thanks!
service change at a stripmall, new 800A main
1. if contractor drives a new ground rod, does existing (present)ground rod need to be bonded? (rod is approx 1' outside new switchgear.
2. if existing ground rod is "not present" (cut off @ grade?) is there a requirement to bond?