Illionois to require EV charging in all new units starting 2024

Status
Not open for further replies.
Per the text of the bill, the requirement is to provide conduit for a future EVSE installation to a parking space, as well as panelboard capacity for a 40A 208V or 240V branch circuit. I don't see any requirement to size the upstream distribution equipment and service for that future load, but I didn't read the full text of the bill. Which is available here:


Cheers, Wayne
 
Per the text of the bill, the requirement is to provide conduit for a future EVSE installation to a parking space, as well as panelboard capacity for a 40A 208V or 240V branch circuit. I don't see any requirement to size the upstream distribution equipment and service for that future load, but I didn't read the full text of the bill. Which is available here:


Cheers, Wayne
This would atleast allow for a future system that uses a CT to prevent overload though.
 