Hey guys, trying to find a both UL Listed and CECHA Approved tap box with the following specifications:
1 800 Amp single phase bussing
2 NEMA 3R
3 "Load side" has to have lugs to feed 4 services
My primary supplier is 22 week lead time, and this is for an emergency service repair. The original service conductors ran underground in rigid steel conduit and have ALL faulted welded to the conduits. WE did try to pull them put, and that did not end well !
I am hoping that maybe someone here has a lead on a panel builder that can do this quickly (ha ha).
BTW, customer is currently on a diesel generator at great expense to keep his business alive. As an aside, in the Chicago area on commecial properties the customer owns the underground conductors and raceways from the transformer to the meters.
Howard
1 800 Amp single phase bussing
2 NEMA 3R
3 "Load side" has to have lugs to feed 4 services
My primary supplier is 22 week lead time, and this is for an emergency service repair. The original service conductors ran underground in rigid steel conduit and have ALL faulted welded to the conduits. WE did try to pull them put, and that did not end well !
I am hoping that maybe someone here has a lead on a panel builder that can do this quickly (ha ha).
BTW, customer is currently on a diesel generator at great expense to keep his business alive. As an aside, in the Chicago area on commecial properties the customer owns the underground conductors and raceways from the transformer to the meters.
Howard