The city of parkland chief electrical inspector is requiring that concrete precast light pole be inspected at the time of installation. Their requirement is that they watch each pole being set in the auger drilled hole. Any poles set without being watched by the electrical inspector must be removed. I asked this inspector why he is the only municipality I have ever set a pole in that has such a ridiculous requirement. He replied that he has caught 3 electrical contractors in the past cutting the ends off precast concrete poles because they could not dig the hole to the required depth. I guess I have two questions. #1 Does anyone know who's cutting the ends off the poles and making my like so difficult. #2 Has anyone heard of such a dumb thing. I have taken out (14) 30' precast concrete poles buried 10' deep and have tried to coordinate for 3 days now a good time for the inspector and my auger truck driver to meet up to no avail. Day one the inspector had continuing education. Day two the inspection called in for day one did not carry over for day two so we technically did not call an inspection if for day two. Day three is today and somehow we did not officially call an inspection in. Where do I go surrender?