bgelectric
Senior Member
The inspector is requiring all steel I beams to be bonded with a continuous conductor.
The building is wood frame with steel I beams and posts throughout not interconnected through foundation rebar or any way.
Also have pex tubing run through out the building with copper stubs poking through the walls. He wantes all these pieces of copper bonded together.
Can someone give me an exact code reference for this if any?
The building is wood frame with steel I beams and posts throughout not interconnected through foundation rebar or any way.
Also have pex tubing run through out the building with copper stubs poking through the walls. He wantes all these pieces of copper bonded together.
Can someone give me an exact code reference for this if any?