I have intersystem bonding termination which is connected inside to the neutral bar of the main service disconnect with #4 AWG conductor. The neutral bar is connected to the main service disconnect enclosure, has main bonding jumper which connects to the equipment grounding bus bar. The main service grounding electrode system is also connected to neutral bar.
I understand 250.94 says various locations but I am confused one of them is service equipment but not sure what that implies I.e inside the service equipment any bars or equipment itself etc. Can intersystem bonding termination be connected to neutral bar of service disconnect?
I understand 250.94 says various locations but I am confused one of them is service equipment but not sure what that implies I.e inside the service equipment any bars or equipment itself etc. Can intersystem bonding termination be connected to neutral bar of service disconnect?