Danny89
Member
- Location
- Indian Land
I’ve got 2 separate circuits 120v (hot, neutral, ground)
Disconnect 1 is for a boiler on circuit #1
Disconnect 2 is for a pump on circuit#2.
Is it code compliance to pass through disconnect one to get to disconnect #2 with circuit #2 for boiler?
See photo drawing as a reference.
Please support your answered with code articles.
Thanks in advance!
Danny
Sent from my iPhone using Tapatalk
Disconnect 1 is for a boiler on circuit #1
Disconnect 2 is for a pump on circuit#2.
Is it code compliance to pass through disconnect one to get to disconnect #2 with circuit #2 for boiler?
See photo drawing as a reference.
Please support your answered with code articles.
Thanks in advance!
Danny

Sent from my iPhone using Tapatalk