Is it code compliant to pass through one disconnect a second disconnect with 2 separate circuits?

Status
Not open for further replies.

Danny89

Member
Location
Indian Land
I’ve got 2 separate circuits 120v (hot, neutral, ground)

Disconnect 1 is for a boiler on circuit #1

Disconnect 2 is for a pump on circuit#2.

Is it code compliance to pass through disconnect one to get to disconnect #2 with circuit #2 for boiler?

See photo drawing as a reference.

Please support your answered with code articles.

Thanks in advance!
Danny
ec2a199223e489ab87a6063fdc9a9043.jpg



Sent from my iPhone using Tapatalk
 
Status
Not open for further replies.
Top