I've been seeing them this way for many years now.
We take our Antenna cables for our Radios, and feed them through a Polyphaser in a NEMA3 or NEMA4 enclosure outside,
with the Bus Bar attached to a 4/0 down comer before we send them into the Equipment Room in the Building.
Is their a Code or Requirement that states this, or is it a Trade Practice?
Can a Polyphaser be mounted on a Bus Bar inside a Building?
Personally I don't see why not, but if I do it, I'm sure I'll be criticized and asked to redo it.
We take our Antenna cables for our Radios, and feed them through a Polyphaser in a NEMA3 or NEMA4 enclosure outside,
with the Bus Bar attached to a 4/0 down comer before we send them into the Equipment Room in the Building.
Is their a Code or Requirement that states this, or is it a Trade Practice?
Can a Polyphaser be mounted on a Bus Bar inside a Building?