hi all.
there is a large new building about 800 foot long 100 foot wide. High bay. cut into 18 tenant spaces. Large garage doors , future offices, warehouse,production,...parking and pole lighting. you get it.
this building is at the end of a large industrial park.
that large industrial park has many services at 480 volt.
this new building is going to be fed from a set utility transformer to a 1600amp disconnect feeding a 20 circuit breaker meter bank. 2 inch pvc goes from bank to each tenant space for a 200 amp 3 phase 4 wire panel.
the new system is going to be a 120/208 volt 3 phase 4 wire.
as I've almost filled 2- 200amp 3 phase panels for one large tenant with 120 volt florescent lights 208 volt high bays,3 -50 amp roof units. 60 amp mixers.
there is a large new building about 800 foot long 100 foot wide. High bay. cut into 18 tenant spaces. Large garage doors , future offices, warehouse,production,...parking and pole lighting. you get it.
this building is at the end of a large industrial park.
that large industrial park has many services at 480 volt.
this new building is going to be fed from a set utility transformer to a 1600amp disconnect feeding a 20 circuit breaker meter bank. 2 inch pvc goes from bank to each tenant space for a 200 amp 3 phase 4 wire panel.
the new system is going to be a 120/208 volt 3 phase 4 wire.
as I've almost filled 2- 200amp 3 phase panels for one large tenant with 120 volt florescent lights 208 volt high bays,3 -50 amp roof units. 60 amp mixers.