Bama_Electrical
Senior Member
- Location
- Alabama
- Occupation
- Electrician
I completed a rough-in a few months ago for a new residential home. Was just notified that the built-in microwave will be moved to the kitchen island. I ran romex #12 uf to the island through conduit in the floor on its on dedicated circuit. Trying to determine if it is ok to have the microwave on the island circuit or if I will have to run another #12 for the microwave. If I had to do that, conduit fill becomes an issue as well as access now that everything is dried in. Thoughts?