Unable to find code requiring, or not requiring.
2 1/2" PVC conduit riser to line-side overhead, then load-side 3" PVC conduit in trench 150' to side-by-side 200A distribution panels (with GEC).
But does the isolated meter base with no disconnects or distribution require it's own GEC?
	
		
			
		
		
	
				
			2 1/2" PVC conduit riser to line-side overhead, then load-side 3" PVC conduit in trench 150' to side-by-side 200A distribution panels (with GEC).
But does the isolated meter base with no disconnects or distribution require it's own GEC?
Attachments
			
				Last edited: 
			
		
	
								
								
									
	
		
			
		
		
	
	
	
		
			
		
		
	
								
							
							 
				
 
			