I have a few questions on installation of this system:
At existing meter pan is 2/0 CU SEU, and Main distribution panel is 200 AMP. Utility neutral strap only, with no separate ground.
1 -Should neutral bonding jumper remain connected on the ATS?
2 - Should the ATS be grounded separately or should the ATS utilize the Main Distribution's ground rod?
3- Should the generator have it's own ground rods - 2 called for, front and rear of unit or utilize neutral only.
Thanks.