Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
As some of you already know I am helping estimate a large outdoor temporary electric job. I am thinking about the labor associated with the 300 & 750 kva transformers and 2500a & 1000a switchboards. They are all gogin in about the same area but I would think the labor for unloading and getting them to the area would be a lot less then usual as the unload might be right near the area. We can go right from a truck to fork lift to slab where it is being set.