how would a generator be classified at a landfill that is a standby system for a flare & blowers, its a new installation to an existing system, plan review was done by the state, I am doing the field inspections, just curious about the generator legally required or optional, not much info on the plans, hoping maybe somebody on this site designs or deals with these systems