Have an unusual set up. Were installing a 3000A service and having an issue sourcing a switch in time. Utility is ok with me installing a "pull box" with terminal blocks to accommodate until the switch comes in
We will be installing 8 sets of 4 inch pvc with 4 750 mcm conductors in each, i need to size a big enough pull box to house the conductors and terminal blocks
Any help is greatly apricated