All,
I have an application at a landfill in which I need to power a pump. The pump is in a location in which i can not direct burial anything. This is because we can not penetrate the land fill cap which is basically at grade. Question: Is it acceptable by code to run MC cable on top of ground to this pump location? Where does the code reference this? Other suggestions?
Thanks
I have an application at a landfill in which I need to power a pump. The pump is in a location in which i can not direct burial anything. This is because we can not penetrate the land fill cap which is basically at grade. Question: Is it acceptable by code to run MC cable on top of ground to this pump location? Where does the code reference this? Other suggestions?
Thanks