Hi all,
We do MEP, civil/structural engineering and recently installed a small PV system at our office. We've drawn plans for an addition to the office and want to double the size of our PV system while also adding back up battery(s) (from 10 solar panels to 20). As it is currently, the PV system power is used by the building panel, and any excess energy sold back to utility with bi-directional meter.
To be clear about the functions/operations that we're looking for with the addition:
When all PV power is not being used by the building, it should fill the back up battery(s) before selling back to utility. Power from the back up batteries should be used before utility power, but only when the PV power is insufficient.
Any and all advice welcome, below are my main questions/concerns.
We do MEP, civil/structural engineering and recently installed a small PV system at our office. We've drawn plans for an addition to the office and want to double the size of our PV system while also adding back up battery(s) (from 10 solar panels to 20). As it is currently, the PV system power is used by the building panel, and any excess energy sold back to utility with bi-directional meter.
To be clear about the functions/operations that we're looking for with the addition:
When all PV power is not being used by the building, it should fill the back up battery(s) before selling back to utility. Power from the back up batteries should be used before utility power, but only when the PV power is insufficient.
Any and all advice welcome, below are my main questions/concerns.
- Proprietary nature of Solar Edge: If we continue to use our inverter (and buy a second one for the new string of panels), it's my understanding the we would need to buy one of their smart meters in order to use "smart management" for the functions we need. Is this true, or is it simple enough to use a charge controller & inverter connecting the battery(s) to a separate breaker on the "Existing 60A MCB Panel"? (2nd photo)
- Will the battery inverter/charge controller need to be directly connected to the PV inverter or is it okay to put it on it's own breaker within the outdoor MCB panel?
- Buying a second identical inverter for new panel string vs one larger one for both strings?