I need to include seismic for my conduit racks.
I have low voltage conduits with either cat 6 or 2P/#22 cables.
I need seimic if my conduits racks are more than 5lbs per ft.
How would I calculate this?
Take the conduit weight listed on the spec sheet along with cable weight and make sure I multiple by # of runs?
I have low voltage conduits with either cat 6 or 2P/#22 cables.
I need seimic if my conduits racks are more than 5lbs per ft.
How would I calculate this?
Take the conduit weight listed on the spec sheet along with cable weight and make sure I multiple by # of runs?