mshields
Senior Member
- Location
- Boston, MA
To be sure, Legally Required Standby loads should be on a dedicated ATS so that a facility that needs it would have an Article 700, 701 and 702 ATS's. My question is this, is it mandated that Legally Required Standby have it's own ATS OR so long as the 702 ATS switches in 60 seconds albeit with a mix of 701 and 702 loads, could that be deemed acceptable?