In a commerical building with an emergency generator backing up life safety as well as non-life safety process loads, are two transfer switches required? One for the life safety system and the other for the anciliary systems? In article 517 depending on the size of the service there may be as many as three emergency branches, but I could not find this requirement in any of the article 700's unless I am missing something?