Hey guys,
Section 625.14 of the NEC mentions EV charging stations shall be considered continuous loads. Therefore, where I have a main feeder going to a distribution board that feeds multiple charging stations, that feeder has to be calculated at 125% of the load. Does the code differentiate between Level 1, 2, or 3 chargers? Or is that irrelevant, and I have to calculate at 125% regardless?
Section 625.14 of the NEC mentions EV charging stations shall be considered continuous loads. Therefore, where I have a main feeder going to a distribution board that feeds multiple charging stations, that feeder has to be calculated at 125% of the load. Does the code differentiate between Level 1, 2, or 3 chargers? Or is that irrelevant, and I have to calculate at 125% regardless?