Hi everybody! New here, first post. I’m a building engineer in downtown Seattle. Figured my first post ought to be about something I've been dealing with ever since I started at this building; The Leviton Lev-Lok Receptacle. Didn’t know these existed til I came to this property. Garbage, garbage, garbage. Total and complete junk. Been here a month and already I’ve had 3 calls with these being the culprit. Each one was either the hot or neutral popped out of the twist lock, or was in the process of doing so. EVEN IF these weren’t defective in that fashion, using push-in wire connectors for your pigtails??? Come on! I even cringe seeing people use them on ballasts. I’d immediately fire any contractor I saw roll on to the jobsite with these. Complete junk.
Anyone else had experience with these?