Is there any way to make joints in lift station wet well's motor cord and have it be up to code? A contractor made splices on the motor's cord inside of the wet well and used heat shrink and called it up to code. Being that this is a hazardous location I dont know of any appoved way to make the joints.
 
Reply

Reply

There are no cord connectors listed for a Class 1 Div1 location making a splice impossible. Usually the cords are supplied with the pumps so you will need to contact the pump mfg.
 