If your doing an interior commercial renovation....say 15-20k sq ft floor with 12' ceilings what would determine whether you work off a lift or ladder for ceiling installation task?
And do you mean 12' to the deck, or 12' to the ceiling, as in drop ceiling or hard lid? 12' deck, I might even consider a Baker scaffold, 12' ceiling, a lift would be better in most cases except as infinity stated about walls being in the way. a 12' ceiling means 10' ladders. They get tiresome in an 8 hour day.If your doing an interior commercial renovation....say 15-20k sq ft floor with 12' ceilings what would determine whether you work off a lift or ladder for ceiling installation task?
The number of lifts depends on the number of guys you'll need working on them at any time. If you need to have 4 guys working on stuff above the ceiling simultaneously then you'll need 4 lifts. Since your deck is over 12' lifts would probably be better than 10' or 12' ladders.12' to hung ceiling not the deck. No conduit racks. It is all EMT and no MC cable allowed. Would you need (2) lifts in a 200'x80' space that's interior gut and new install?
Correct so running bracnh conduit above ceiling you may just have one guy? Installing lights above ceiling may be just one guy?The number of lifts depends on the number of guys you'll need working on them at any time. If you need to have 4 guys working on stuff above the ceiling simultaneously then you'll need 4 lifts. Since your deck is over 12' lifts would probably be better than 10' or 12' ladders.
The number of lifts depends on the number of guys you'll need working on them at any time. If you need to have 4 guys working on stuff above the ceiling simultaneously then you'll need 4 lifts. Since your deck is over 12' lifts would probably be better than 10' or 12' ladders.
I usually think three guys on lifts one helper/apprentice on the ground.Correct so running bracnh conduit above ceiling you may just have one guy? Installing lights above ceiling may be just one guy?
Maybe but I don't think that anyone can answer that question without physically being on the job.Correct so running bracnh conduit above ceiling you may just have one guy? Installing lights above ceiling may be just one guy?
Three guys on ONE lift???I usually think three guys on lifts one helper/apprentice on the ground.
Makes sense.Maybe but I don't think that anyone can answer that question without physically being on the job.
Three guys ON liftS. as in 3 lifts. One person on the floor.Three guys on ONE lift???
His title is estimator. He has to estimate how many so he can put the proper amount of lift rental in.Makes sense.
Helper apprentice if capable on the lift, old timer on ground.helper/apprentice on the ground.