Commercial 120/240V 400A CT metered service feeding two 200A load centers. Two-pole breakers in each panel feed a single 12-contact lighting contactor to feed outdoor lighting. Contactor is controlled by PE cell.
Is there an NEC issue with having branch circuits from two different panels feeding the same lighting contactor?