GerryB
Senior Member
- Location
- woodbridge, ct. USA
Upgraded a service last week and while doing so noticed the HO had a lightning system. The braided cable ran down next to the service and was bonded with a strap to the 1 1/4 conduit below the meter. I did not re bond this to either the meter can or my #6 ground. Should I? The braided cable goes into the ground to its own rods I assume. Also it is larger than #6.