What problems or code conflicts exist in running cat5e on POI (power over internet) in the same conduit with 1 surge and 1 lightning electrode conductor?
I read through 800. Does 250 read into to this much?
What problems or code conflicts exist in running cat5e on POI (power over internet) in the same conduit with 1 surge and 1 lightning electrode conductor?
I read through 800. Does 250 read into to this much?
I have 1 #8 thhn from a lightning rod, and 1 separate of the same to:The 300SS Surge Suppressor provides a path to
ground (Protective Earth ) that protects connected
equipment from near-miss lightning strikes. (for a Backhaul module).