What does this really mean? I undertand that the GEC should be connected to the line side of the neutral disconnecting link (at least in Chicago). Is this disconnecting link just the nuetral bus of the equipment? Is there a disconnecting link device that I have to specify? Please clarify. I thought that no devices where needed. Also, should i connect the GEC to the neutral bus or the equipment bus, assuming they have a MBJ in between them?