ryan_618
Senior Member
- Location
- Salt Lake City, Utah
I have noticed that many meter/panel combos have space for 12 breakers. On the info posted on the panel it says to only use 2pole breakers (probably for the 6 movements of the hand rule). If this provision is not part of the actual listing of the panel amd the inspector sees single pole breakers installed, is it an enforcable violation if there are less than 6 breakers installed? Please cite a reference if you say yes.