Edbudrovic
New User
- Location
- Anza, CA
I have a 600 amp three phase 240 stand up section. It has 6 meter spaces but one is unused and has no socket busswork. Currently in use are 4 100 amp services and a 50 amp house panel.I want to upgrade one of the existing services to 200 amp. I have checked with the manufacturer and have secured documentation that the socket and connecting busswork will support the 200 amps. What load calculation can I use to support this and supporting code sections? thanks