Fred B Senior Member Location Upstate, NY Occupation Electrician Feb 24, 2021 #1 Question, when just changing an existing subpanel, do you do a full load calculation and resize or simply replace like for like? Say existing sub is not a full boat.
Question, when just changing an existing subpanel, do you do a full load calculation and resize or simply replace like for like? Say existing sub is not a full boat.
Fred B Senior Member Location Upstate, NY Occupation Electrician Feb 24, 2021 #2 Any obligation in code to recalculate?
petersonra Senior Member Location Northern illinois Occupation Semi-retired engineer Feb 24, 2021 #3 I don't see any requirement in the code to redo the calculations, however the permitting authority might have some such requirement.
I don't see any requirement in the code to redo the calculations, however the permitting authority might have some such requirement.