Load kVA in Panelschedule

Status
Not open for further replies.

shortcircuit1

Senior Member
Location
USA
Hello,

I am a little confused about what load we put in a panel schedule. Lets say you have 100kVA connected load and you add 15% future spare capacity to this. Then the total connected load is 115kVA. As per NEC, if the load is continuous you take 1.25 x connected load to give you the demand load. I use this to size my feeder and breaker feeding the sub-panel. So when I fill the panel-schedule for this particular breaker feeding this sub-panel, under the load, do you take 115kVA as your load and split into three phases or (100 x 1.15 x 1.25=143.75) kVA?
 