I have two nos. of 2 MVA 11kV /433V transformers feeding a facility which the loads are predominantly computer loads under UPS.
When I feed the loads on Transformer-1, the reading shows 430MW and when I switch over to Transformer -2, the reading shows 650MW and even 750MW.
What is the reason for this inconsistency? What should I do in order to rectify this problem?
When I feed the loads on Transformer-1, the reading shows 430MW and when I switch over to Transformer -2, the reading shows 650MW and even 750MW.
What is the reason for this inconsistency? What should I do in order to rectify this problem?