Fairly often during an inspection I am asked about generators. I am aware that most units have load shed capability but I have not seen them in operation so I have a question.
Lets say I have a 20kw generator and I decide to put a A/C with a 10kw heat strip on the load shed contacts to meet Code requirements.. When the other loads are reduced to the point that the 10kw can be operated, will the generator allow it to run and then turn it back off as needed or is the load shed completely off as long as the gen is running ?
Lets say I have a 20kw generator and I decide to put a A/C with a 10kw heat strip on the load shed contacts to meet Code requirements.. When the other loads are reduced to the point that the 10kw can be operated, will the generator allow it to run and then turn it back off as needed or is the load shed completely off as long as the gen is running ?