doddman1
Member
- Location
- Marion, IL
- Occupation
- RCDD
I'm designing a grounding and bonding system for an existing college from scratch as part of the structured cabling system. They have an Entrance Facilty about 100' from their Main Equipment Room or MDF which is where most of the servers and switches reside. Should the Main Grounding Bus Bar be installed at the Entrance Facility or is it okay to install it at the MDF?