Location....

Status
Not open for further replies.

1793

Senior Member
Location
Louisville, Kentucky
Occupation
Inspector
I have a 30a 240v feed out to a Tool Shed. Customer wants 4 circuit panel installed. Having to drive ground rod, where will I find the wire size needed from gnd rod to panel?

250.66 or 250.122

Thanks
 
Also, extra ground rod and wire = $15.00 : meter to test = $$$$$$$

If the area is really easy to get 25 ohms with one rod and you are doing a hundred homes it may be worth it if the inspector doesn't make you prove each one to him/her.
 