Hi, I just returned from looking at a potential job and I have some questions on this one, as in the past I only ran a short underground service.
All have been overhead.
And with all the knowledge out there I would like some advice please!
The power company will only allow underground in this situation as it's new construction.
Ok, The power company will supply me with power to a pole where I must supply (2) 200A meter sockets. I assume 5' to center from grade as usual.
Do these need to have a main breaker in them and do they need to be grounded with a rod at the meter as well as the house and barn?
The main house is 230' from the meter and the barn is just under 100'
I will probably use 4/0 in 2"pvc to the barn.
Then (2) 4/0 wired in Parallel in 4" pvc, to the main house?
Is a pull box required every 100'?
Is there anybody out there that is familiar with this type of sitution? Thanks, Bob
All have been overhead.
And with all the knowledge out there I would like some advice please!
The power company will only allow underground in this situation as it's new construction.
Ok, The power company will supply me with power to a pole where I must supply (2) 200A meter sockets. I assume 5' to center from grade as usual.
Do these need to have a main breaker in them and do they need to be grounded with a rod at the meter as well as the house and barn?
The main house is 230' from the meter and the barn is just under 100'
I will probably use 4/0 in 2"pvc to the barn.
Then (2) 4/0 wired in Parallel in 4" pvc, to the main house?
Is a pull box required every 100'?
Is there anybody out there that is familiar with this type of sitution? Thanks, Bob