I took the Michigan Masters exam last week back (NEC 05) and had a few questions baffle me. I could use help finding the answers. If you can, please site code ref. Questions were something to the effect;
1) Additions more than ____ square feet require service load to be recalculated.
A 100, B 250, C 400, D 1000
2) What is the maximum wire fill of concrete cellular conduit?
A 35%, B 40%, C 53%, D 60%
3) What is the maximum pigtail lenth for an office partision?
A 12", B 24" C 36", D 48"
4) underground service conduit emerging into a building must be___.
A shielded, B sealed, (C and D were something obviously not the answer).
1) Additions more than ____ square feet require service load to be recalculated.
A 100, B 250, C 400, D 1000
2) What is the maximum wire fill of concrete cellular conduit?
A 35%, B 40%, C 53%, D 60%
3) What is the maximum pigtail lenth for an office partision?
A 12", B 24" C 36", D 48"
4) underground service conduit emerging into a building must be___.
A shielded, B sealed, (C and D were something obviously not the answer).