lilsparky
Member
- Location
- Madison, Al
I am updating an existing site that was built in the early 1960's. I need to replace the existing MCC that was used as a main entrance service and is also feeding a lot of motor loads. I am having problems with sizing the new MCC. Do I need MCC sizing software or is this something I can do with calculations?Some of the equipment is being replaced and I am adding new motors. I know the breaker sizes but can't figure out what the next step should be. Also there is a 500 KVA outdoor transformer that feeds this MCC which may or maynot be overloaded.