200A residential service, drops to meter, then to outside WP fused disconnect, then load side of disc. travels through crawl space to 200A main breaker panel.
Q: Does code section 250.24(B) allow you to bond the neutral at the panel board instead of at the outside disconnect switch? Or must it be bonded outside ONLY?
Q: Does code section 250.24(B) allow you to bond the neutral at the panel board instead of at the outside disconnect switch? Or must it be bonded outside ONLY?