New service equipment. Meter main(s), 400 amp, 1- phase, 240 volt with 2 meters and 2 breakers for duplex.
Factory installed main bonding jumper from neutral bar to the enclosure.
Separate factory installed ground bar is bolted/screwed to the enclosure.
My question is does a bonding jumper between the neutral bar and the ground bar need to be installed?
I think that there needs to be a supply-side bonding jumper installed based on Table 250.102(c).
Thanks