G Gategator37 Senior Member Oct 7, 2010 #1 Dumb question but can someone break down the differences between these (2) breakers? thanks.
charlie b Moderator Staff member Location Lockport, IL Occupation Semi-Retired Electrical Engineer Oct 7, 2010 #2 All I can offer is that I have heard of the first, but not the second. My guess is that the second is a slang term for the first. Do you have a context in which you have seen the two terms used to describe separate entities?
All I can offer is that I have heard of the first, but not the second. My guess is that the second is a slang term for the first. Do you have a context in which you have seen the two terms used to describe separate entities?
G Gategator37 Senior Member Oct 7, 2010 #3 I have an input breaker coming in from a paralleling gen set. I have a main breaker feeding a PHM MV Switching Cabinet and a Tie breaker feeding another utility entrance switchgear. All of this is located within one Utility Service Entrance Switchgear.
I have an input breaker coming in from a paralleling gen set. I have a main breaker feeding a PHM MV Switching Cabinet and a Tie breaker feeding another utility entrance switchgear. All of this is located within one Utility Service Entrance Switchgear.