Currently I'm doing some Load planning for a petrochemeical Plant of 15MVA Load. the plant is 1200 ft (W) x 600 ft (L). I am planning to design one PDC (power distribution center) or main electrical room for the whole plant. Is there any recomendations on radious of coverage per PDC?